Having completed the first phase of 14000 metres of a Diamond Core Drilling project, we are now entering the second phase where Resource and Exploration Scout Drilling will commence. Committed to this project are 2 x CS1000’s, 1 x Man Portable Rig and 1 x RC Prospector 2000 Rig.

Within Senegal we operate an Explorac 220 RC rig and booster with a CS1400 Diamond Core Rig due to commence drilling mid November.

Projects that have been succsessfully implemented include the following:

  • SMFG Guinea 2009
    2 x CS1000’s, with helicopter support

  • African Aura 2009/2010
    2 x CS1000’s and 1 x Man Portable rig

  • BHP Billiton Worldwide Exploration 2008/2009
    1 x RC rig with Booster and 2 x CS1000’s

  • BHP Billiton Worldwide Exploration 2010
    1 x RC rig with booster